The Mille Lacs Band of Ojibwe, Community Development office will be accepting sealed lump sum bids for a residential renovation at 7586 Patti Drive, Lino Lakes, MN. Bids will be due Wednesday June 17th, 2026 at 3:00 PM. Bids received will be opened and qualified by the Mille Lacs Band of Ojibwe on Thursday June 18th, 2026 at 10:00 AM.

A mandatory Pre-Bid site visit will be held Monday June 8th, 2026 at 2:00pm. 7586 Patti Drive, Lino Lakes, MN 55014.

General Notes:

  1. It is the Contractors responsibility to identify any and all discrepancies in the scope of work, not meeting Industry Standards or that which is inconsistent with the International Residential Code (IRC), and Mille Lacs Band of Ojibwe 2025 MLB Project Specification Book.
  2. All electrical wiring, apparatus and equipment for electric light, heat and power, technology circuits or systems shall comply with the rules of the Department of Commerce or the Department of Labor and Industry, as applicable, and be installed in conformity with accepted standards of construction for safety to life and property.
  3. Contractor must reconnect all utilities, service panel or service feed. Also includes gas, propane. Include such equipment or materials identified in the pre-bid conference.
  4. Contractor will secure all permits and fees.
  5. Contractor is responsible for a thorough investigation of the scope of work.
  6. Contractor will repair any damage to the property or structure created by the scope of work.
  7. NO WORK SHALL BE PERFORMED UNTIL ALL REQUIRED PERMITS HAVE BEEN ISSUED AND COPIES IN THE POSSESSION OF THE PROJECT COORDINATOR AND /OR MILLE LACS BAND BUILDING OFFICIAL.

Work Scope Description:

Interior: Master Bathroom:

  1. Demo existing bathtub unit and ceramic tile surround and drywall as needed to complete the installation of a new alcove shower system. Protect water supply and waste piping for re-use.
  2. Install new shower valve (Moen Engage Posi-Temp one handle Matte Black Shower Faucet 82304BL) and extend supply lines to proper height for shower installation. Modify shower drain as needed for connection to new shower base.
  3. Install grab bar backing in the alcove opening (side and rear walls). Install new shower valve and shower rough-in.
  4. install Johns Mansville GoBoard backer board or Georgia Pacific DensShield backer board in shower alcove. Tape and finish to prepare for shower system per all manufacturers installation instructions.
  5. Mud, sand to blend into existing drywall, prime and paint all bathroom walls (Eggshell finish). Owner to select color.
  6. Provide and install 4 Piece FlexStone Shower Base 60”W x 32”D and 3 Panel Royal shower wall kit. Color to be Oyster. (Model 6954872 Menards Sku: 695-4872) Configured for the alcove installation Right Drain. Coordinate shower base to fit with ceramic tile flooring. Neatly caulk the shower base to flooring. Supply and install transition if needed.
  7. Supply and install 3 additional FlexStone Oyster corner shelves. (Menards Sku: 671-3664)
  8. Provide and install new shower door system MAAX Halo 59”x78-3/4” Matte Black Semi Frameless Sliding Shower Door with Clear Glass. (Menards SKU 671-4843)
  9. Provide and install (2) Grab Bars: 24” horizontal on rear wall and 12” vertical on the active door sidewall.

Specified Product Substitutions: All proposed product substitutions must be approved by the Project Coordinator 5 days prior to bid. Any approved substitutions, will be made available to all bidders.

Contacts:
Interested bidders shall contact either Ryan Jendro at 320.630.5011 or by email at ryan.jendro@millelacsband.com to be included on the bidder’s list in the event that any addendums are issued for this project.

Mobilization:

  1. The Contractor shall be capable of mobilizing his equipment and crews within seven days of the receipt of Notice to Proceed.
  2. Contractor shall provide means and methods for all building phases of construction.

COMMUNITY DEVELOPMENT/PROJECT MANAGEMENT RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS FOR ANY REASON.

COMMUNITY DEVELOPMENT WILL, TO THE GREATEST EXTENT FEASIBLE, GIVE PREFERENCE IN THE AWARD OF CONTRACT TO INDIAN ORGANIZATIONS AND INDIAN-OWNED ECONOMIC ENTERPRISES.

Bidding notes:

  1. Submit proposal in lump sum (supply and install), not to exceed amount
  2. All Contractors (including subcontractors) must comply with Davis Bacon wage requirements.
  3. All Contractors should provide the following along with their bid submittal:
    a. Completed and signed MLB Community Development Construction Bid Form (will be disqualified without)
    b. A copy of Current MLB Vendor’s License (or a copy of the submitted application)
    c. A copy of Current Insurance Certificate
    d. A copy of Subcontractor/Material Supplier list
    e. A copy of valid State of Minnesota Contractor’s License
    f. A copy of Authorized Signature Sheet (submitted with first bid submittal)
  4. All Contractors must comply with all Mille Lacs Band of Ojibwe American Indian Employment requirements (see 18 MLBSA § 5). Contact Lori Trail at (320) 532-4778.

All proposals must be mailed and labeled as follows:
Mille Lacs Band of Ojibwe
Commissioner of Community Development
Sealed bid: 7586 Patti Drive
PO Box 509
Onamia, MN 56359

Please note that the bids submitted via mail to the P.O. Box. FedEx and UPS will not deliver to a P.O. Box and the Onamia post office will not accept hand delivered items. Please plan accordingly to ensure the timely receipt of your bid submittal. Do not require delivery signature.

**The Band reserves the right to reject any bid that it is unable to collect at the Onamia post office by the bid deadline date and time, provided that the Band has made diligent and reasonable efforts to collect the bid. The Band reserves this right even in the event that the bid has been postmarked before the deadline.

PROPOSALS NOT SUBMITTED IN THIS MANNER WILL BE REJECTED.

Licensing:
Firms must be licensed with the Mille Lacs Band of Ojibwe. A copy of this license (or the license application) must accompany each bid. Licensing process can take several weeks. If you are not currently licensed with the MLBO, please submit a copy of your license application along with your proposal. Contact Jackie Smith at (320)384-4773 or via email at Jsmith2@grcasinos.com with questions regarding licensing and for the license application.

PERMIT AND CONTRACTOR REQUIREMENTS:
Permits: Contractors are responsible to attain all necessary permits for all work, including City of Lino Lakes, MN

Bonding Requirements: In accordance with 2025 MLB Project Specification Book. Please note that bonding requirements on Mille Lacs Band Funded Residential projects has changed. All projects over $100,000 require bonding regardless of company ownership.

MLBSA Section 17 Procurement Statue Ordinance 03-06 states the following:

Section 17. Bonding

A. For all Band funded residential construction projects, a performance bond is required for contracts in excess of $100,000.00. The performance bond shall be at a minimum twenty (20%) percent of the contract price, but not in excess of $500,000.00.